Summary Skills:


  • Seasoned Telecommunication Professional offering more than 18years of successful, home-grown leadership talent and extensive telecom experience.
  • Project Management Professional - Leading to Project Management Professional (PMP) certification with Completed 35 Contact hours in possession.
  • A dynamic Telecoms Management Executive with several years of experience in operations management, project management, service delivery management, technology strategy as well as business strategy.
  • I have the overall responsibility for Strategy and to provide leadership for the entire operations group covering Networks, Information Technology, Supply Chain, Strategic Quality and Business Processes so as to ensure global best in class network, processes and tools at the lowest possible cost.
  • Manage the Optical network in delivering optical fiber based projects including dark fiber delivery, DWDM network implementation, packet overlay network implementation, traffic migration, optimization and 4G/LTE.
  • In depth knowledge in project management for 2G, 3G, 4G/LTE wireless network and Fixed wireline via IP MPLS and VPLS core network, FTTH, FTTX, OSP facilities, Access and routing equipment with transport like DWDM.
  • Responsible for the production of technical designs across existing transmission platforms including Microwave, PDH, SDH, ATM and Ethernet to fulfill project requirements.
  • Recognized for functional expertise on roll out, start- up projects and network design - most recent accomplishments include the infrastructure build of a nationwide DWDM using NORTEL and Tellabs series to support WiMax, 3G and 2G rollouts; and the formulation of the most cost-effective migration strategy from TDM to IP.
  • Ability to apply formal project management principles and practices during the planning, implementation, monitoring and completion of projects, ensuring effective management of scope, resources, time, cost, quality, risk and communications.
  • Effectively worked in multi-vendor environment having extensive experience dealing with multi-cultural vendors such as Huawei, ECI, Alcatel, Nokia, Ericsson MiniLink, Traffic Node, NEC, NERA, Nortel, Fujitsu, Ceragon, PAV Laser and SPO's 1200 and 1400 series.
  • Manages telecom equipment installation, commissioning, and integration requirement under the roll-out/ expansion project as mandated by Business and compliant to Engineering specifications;
  • Assists in the preparation of Request of Payment and evaluation of bids
  • Recommends contractor assignment based on logistics, competency and cost savings.
  • Responsible for Implementing and maintaining standard project management methodology for all relevant projects across the operation, not only for projects related to the operations area, but also for other areas such as markets, commercial and functional.
  • Responsible for securing resources and for the implementation of processes and tools to achieve best end to end quality of experience towards market leading position in customer satisfaction index.

Work History

Work History
Oct 2011 - Jan 2013

Customer Project Manager

Ericsson Australia

Project Catalina is a large and complex telecommunications transmission design and enablement project. The project scope includes: design and build, migration to IP, management of 3rd parties (multivendor) network inventory and asset management

Project Phoenix is an Optical network for the delivery of optical fiber based projects including dark fiber delivery, DWDM network implementation, packet overlay network implementation, traffic migration, optimization and LTE.                                 

  • Manage the end to end delivery of Core and System Integration projects with stick to Project scope, cost, time, quality and Customer satisfaction aspects and shall have the authorities according to descriptions of the assigned project in line with the Ericsson Customer Project Model-PROPS C.
  • Project will be managed through the full project lifecycle adhering to the corporate methodology and local processes. Leading the project team, with highly self-motivated and results oriented.
  • Have a strong customer focus, analysis and problem solving skills. Self-motivated, with the drive to solve problems and expand the knowledge within the telecom area.
  • With leadership of the project team; manage risks, issues and changes; own and control project budget; regular status reporting (both internally and externally).
  • Assist customers to define and implement complex integrated solutions that optimize their technology to support and grow their business.
  • Conducts coaching, counseling, mentoring and motivating solution architects, team leaders, and team members.
  • Ensures that there are structured processes and established procedures to increase efficiency levels and maintain effectiveness of work environments.
  • Experienced on assuring total quality on project management, business systems analysis and design, solution development, quality assurance and control, and solution product support.
  • Leads project team for medium to large and/or more complex accounts. Plans and monitors delivery phase of project. Plans and manages internal and external resources. Responsible for internal and external project reporting.
  • Acts as a primary project interface to the customer ensuring good customer satisfaction and developing the customer relationship. Shares project experience and best practices, knowledge of project management processes, tasks and tools with other project managers. Identifies and supports new business opportunities.
Feb 2011 - Jul 2011

Transmission Planning Manager

Cybercom Singapore

Phase 2 Node B 3G Project - using the power of collaboration and personal commitment to deliver high impact, measurable benefits to local people. 3G Network Phase II Master Plan is design to guide the continuous network expansion of Tigo 3G network until Dec'2011 in Radio, Transmission and Core network.

  • Manage and supervise Project staff, Design, Sub contractor's and other subject matter expert's delivering into the work stream within overall project group.
  • Project plan and deliver an extremely complex and high risk customer project.
  • Ensuring the best quality throughout the process from design through to acceptance, which in turn ensuring ease of invoicing for payment milestones.
  • Updating line and functional managers of the project progression in terms of timelines, to enable them to plan the movement of resources back to their respective organizations or other projects.
  • Continuously analyze Authorized Service Providers quotations and variations keeping them in line with project scope and allowances.
  • Lead and motivate the project team on a continual basis gaining a high level efficiency and motivation within the team.
  • Continual management of all activities attributed to the project; scope, time, quality and cost, towards its goals during the project phases.
  • Monitoring, controlling and communicating project progress and deliverables whilst being responsible for managing the execution and mitigating risks of the project contractual commitments and focusing on the needs of the customer.
  • Maintaining documentation supplied to the customer is of a high standard gaining customer acceptance after deployment.
Sep 2010 - Dec 2010



Transmission Network Improvement objective is to review the transmission network and identify current network status, configuration and bottlenecks. The service is divided into the audit and implementation part. A set of recommended actions for network improvements is provided in the audit part.

  • Lead the independent audit of the transmission network to examine the performance with respect to set KPI's and to verify that the system is performing as per Network planning documents. Escalate any ambiguity observed for immediate corrective action.
  • Conducts analysis of traffic load on individual transmission links and recommend required expansion and upgrade.
  • Liaise with other divisional staff and contractors on the timely completion and commissioning of the Transmission contracted projects.
  • Ensure all microwave links are designed as per agreed objective and criteria, approve integration, provide review and support for acceptance testing to ensure design implementation.
  • Provides technical expertise to the microwave network implementation functions in order to provide the Company with an effective and efficient transmission interface that best meets the technical requirements and the approved transmission strategy.
  • Coordinate all activities with Airtel Transmission planning team, along with other departments and colleagues as required.
  • Undertakes critical reviews of supplier's transmission network planning programs to ensure validity of information, particularly in relation to the analysis of topographic data frequency planning.
  • Evaluates information from the Network implementation team (roll-out schedule) to enable the network planning of the transmission interface portion of the network data base.
  • Routinely monitor and evaluate network counters, quality measurements parameters, and provide solutions to improve the network performance.
  • Proactively define, and work with the on-site Transmission manager in implementing procedures and standards that will provide effective workflows and satisfy the business needs of the Company: including preventive maintenance routines; fault finding, tracking and clearing; inter-department liaison; and safety procedures on Transmission equipment and Transmission sites.
  • Provide on-the-job training for transmission staff on network planning, optimization and performance.
  • Reviews, refines and validates the technical aspects of proposals for transmission optimizing network design and extension.
  • Assist in training the local staff on best practices in Transmission network implementation, commissioning and acceptance.
Feb 2010 - Aug 2010

Transmission Planning Manager

Cybercom Singapore

I was the key player in the success of the Phase 2 Transmission Rollout and Expansion (SDH Upgrade and ring splitting) projects for Tigo Rwanda. Conceptualized and presented to top management the three (3) and five (5) years multi master plan of Fiber in the Loop (LTE ready) in coordination/parallel with the local government unit to utilize/lease spare duct along the main ring to maximize profit relative to link and connect to International Gateway Facilities towards Uganda and Tanzania

  • Providing systems engineering direction in complex network environments including wireless and wire-line systems design, integration testing, systems engineering methodologies and project management.
  • Provide direction with the network supervision plans and manage the technical team.
  • Supervise the quality of MW core network performance as related to installation, commissioning and functionality of core network elements.
  • Program manage the delivery IP backhaul (Outside Plant facilities) for the Operators mobile growth program and coordinate the activities of all working groups to meet the plan and objectives.
  • Coordinating and directing project resources make sure tasks are completed on time.
  • Tracking and reporting on project progress and chairing project meetings providing written status.
  • Managing quality process and coordinating change management process
  • Escalating issues as necessary and tracking project deliverables.
  • Providing project status to management as necessary.
  • Attend project implementation and review meetings.
  • Preparing, planning, executing, monitoring, controlling and closing the project or subproject according to contractual scope and commitment against project budget.
  • Ensure implementation of services in delivery scope and final acceptance, overall responsible or support for Program Manager.
  • Planning activities for extension of fibre routes (Outside Plant facilities) directly to Transmission High Sites.
  • Planning activities for SDH microwave backhaul onto the dark fibre network
  • Selection and evaluation of existing sites in close proximity to fibre routes for upgrade to POPs.
  • Develop strategy for upgrade of Node B sites to POPs for SDH MW collection.
  • Formulate strategy for upgrade of Transmission High Sites to accommodate dark fibre connection (Outside Plant facilities)
Aug 2009 - Feb 2010



Essential duties and achievements:

  • Accountable for projects success in terms of project deliverables, profitability andcustomer satisfaction.
  • Ensure that the implementation of all projects is under control and meets fully the contractual commitments.
  • Provide overall direction for activities of the subordinates.
  • Monitor performance and provide feedback to the subordinates.
  • Responsible for the production of technical designs across existing transmission platforms including Microwave, PDH, SDH, ATM and Ethernet to fulfill project requirements.
  • In charge for impact assessment and customer liaison to facilitate requirements capture and definition of transmission projects.
  • Able to support project management to ensure transmission projects are delivered to the required design, quality and network standards.
  • Manage the business to ensure that project achieve targeted Gross MarginIn-depth knowledge of transmission media such as Microwave, Optical Fiber, and wire lines (copper).
  • Prepares and maintains realistic project, quality, and risk plans, including plans incorporating sub-projects, monitors and controls team performance against each plan, providing reports to client / user management and senior management as required.
  • Fulfill the project requirement and satisfy all project stakeholders.
Jun 2008 - Aug 2009

TECHNICAL CONSULTANT/ Senior Transmission Engineer

Cybercom Singapore

Working for the Company's Managed Services

  • Perform detailed technical design work and produce detailed costing of all aspects of a transmission solution.
  • Provide technical review and impact analysis of customer transmission requirements.
  • Work with the vendors to verify technical designs and confirm installation requirements.
  • Review and approved vendor project plans and support implementation of that plan.
  • With operations teams manage the integration of new equipment into the network.
  • Intermediate and Backbone planning for rollout and expansion projects.
  • Dimensioning and capacity planning for rollout and TRX expansion projects.
  • Perform technical site survey and verification of LOS.
  • Issue BOQ, Link budget, Traffic routing schematic diagrams for implementation.
  • Equipment dimensioning for access, intermediate and backbone requirement using Ericsson Traffic Node, Ericsson High capacity and Marconi LH radios.
  • Update Head of the Planning regarding the status of Transmission Planning activities.
  • Leads the TSS team and take care of the budget, car allocation and other issues involving TSS.
  • Coordinate with Vendors and work closely on transmission issues by opening cases and following up the issues are resolved.
  • Optimization of transmission network to achieve the target KPI.
Apr 2007 - Jun 2008

Regional Project Manager

NetPlan LLC

I project manage the transmission in East Ukraine and was managing transmission planning teams in Donetsk, Kharkov, Dnepropetrovsk and Crimea regions. Proposed/ involve in preparation of transmission optimization proposal for customer and trials for new transmission products FH XC and SRA 4.

 Take responsibility for the delivery of complex projects, leading project team members from NSN, customers and third-parties as required.

  • Establish and manage realistic project, quality and risk plans. Monitor and control team performance against each element of the work-breakdown structure.
  • Act as the primary point of contact for the delivery of the project. Manage the project stakeholders effectively within the customer, NSN and third-parties, based on the project communications plan. Set and manage expectations appropriately.
  • Control resources and costs against the project budget. Ensure that change control procedures are actively used to assess and manage the impact of proposed changes to the project on costs, timescales and scope.
  • Lead diverse project teams, allocating and monitoring tasks, motivating staff and providing input to individual performance appraisals. Ensure that projects are formally accepted and closed by the customer, and that all project deliverables and documentation are completed to the required standard.
  • Provide feedback on project team members, and input to regular performance reviews as requested. Advise line managers on the development and training needs of project staff.
Jun 2005 - Apr 2007

Team Lead – Fiber Backbone Transport Network

SMART Communicattions Inc

Essential duties and achievements:

  • Manages directly contractors of network outside plant facilities under roll-out or network expansion projects per requirement mandated by business and compliant to engineering specifications and covering:
  1. Field survey and staking
  2. Construction of proposed OSP facilities
  3. Implementation of proposed upgrades on existing facilities
  4. Post-construction permitting works and close-out
  • Organizes and leads the section in managing assigned contractors in the performance of facility construction.
  • Performs financial/cost management.
  • Manages vendor performance.
  • Facilitates resolution of inter and intra department issues and conflict.
  • Turns over completed projects to operations group.
  • Deliver on-time complete OSP facilities per roll-out requirement
  • Maintain actual project expenditure within approved budget and cash flow projection
  • Deliver completed project including turnover and close out documentations.
  • Oversees implementation of the project plan, monitors progress, resource usage and quality, and makes needed adjustments.
  • Identifies, allocates and manages resources needed to meet project objectives
  • Identifies potential roadblocks and risks and develops contingency plans to deal with them
  • Demonstrates good working level knowledge on all facet of construction management, cost estimating, quantity and quality control/inspection & acceptance and monitoring and close-out
  • Knows the procurement cycle and processes, gathering of information through RFIs and RFPs, roles of interdepartmental partners and the proposal/evaluation processes.
  • Improves service levels - works with business leaders to enact changes in the environment and process.
  • Understands and follows a process in problem management, change management or configuration management.
  • Monitors SLA's and escalates problems.
Mar 2001 - Jun 2005

Transmission Team Lead/ Senior Transmission Engineer

SMART Communications Inc.

Essential duties and achievements:

  • Design of new Microwave network based on 2G and 3G rollout projection
  • Project Management of rollout for Radio Network
  • Planning for migration of SDH major nodes from microwave to FOC network.
  • Implement delivery group program budget and reporting which is consistent with the project governance requirements.
  • Implement a progress reporting capability consistent with governance requirements.
  • Establish project deployment processes and procedures.
  • Foster channels of communication to expedite project activities.
  • Manage internal project teams and external suppliers to meet project objective.
  • Plan and communicate accurate demand figures for demand planning process.
  • Ensure that all project targets are met e.g. progress, quality and cost by using in-house toolset, interfaces and standard site process milestones.
  • Lead and monitor the project/sub project team including partner/service suppliers.
  • Provision and optimization of transmission route for Iub, Iur, Iu-PC & Iu-CS interface of 3G Networks, Abis, Ater, A interface, E1 Signalling of 2G Networks & Gb Links for GPRS/Edge applications and Wireless Broadband Access (WiFi, WiMax and DSL)
  • Transmission planning & dimensioning of GSM network rollout. Upgrade of SDH rings in preparation for 3G launch. Microwave PtP & PmP radio link calculations, frequency planning and interference analysis.
  • Design Master Plan for SMART Nationwide Transmission Network supporting SMART Projects and Programs including BTS, Wireless Broadband Access, 3G Roll-out, NSS IOT, BSS Abis, Ater, GPRS and IP Corporate WAN.
  • Administer commissioning, testing, acceptance and activation of SDH equipment FOC transmission facilities.
  • Ensure effective management of E1, Ater and IOT resources to support NSS, Wireless Centers, Business Office, One Call Center and interconnection roll-out expansion.
  • Experience with copper and/or fiber cabling design required. Interact with engineering management, right-of-way agents, and any other parties involved in the planning of fiber optic operations.
  • Good knowledge of Routing and IP planning for MW and Leased line connections.
Nov 1997 - Jul 2000

TECHNICAL CONSULTANT/ Outside Plant Network Planning Engineer

Norconsult Telematics

Essential duties and achievements:

  • Planning, design and implementation of outside plant facilities including copper cable, fiber optic cable, digital loop carrier, switch remotes and emerging technologies such as DSL.
  • Perform HDSL, Pair Gain Devices/Design using Telpus 10T (10 channel Digital Pair Gain System).
  • Familiar with a variety of pedestals, cabinet housing and terminal block, as well as variety of splice enclosure (aerial and buried).
  • Daily interface with internal and external construction crews to ensure deadlines are met to meet customers due dates.
  • Survey potential cable routes and prepare maps and diagrams for planning.
  • Coordination of facility requirements and construction activities with vendors and partners including other utility companies.
  • Estimate materials, installation, and engineering labor costs, for budgetary analysis.
  • Prepare plan from S.T.C. Planning Department (Graphic Primary, Detailed Conduit, Pressurization Diagram, etc. for container cut-over.
  • Supervise the site for the cable laying and the necessary data for the preparation of the design. Check the MDF, manhole involved, cable vault, compressor location, and SRS-MDF, Telex and SRS Radio lines.
  • Carry out engineering routine and specific outside plant work orders and provide field support to the outside plant provisioning process by performance of field work, preparation of work order drawings and documentation.
  • Preparing Bill of Materials.
Feb 1997 - Nov 1997

Network Planning Engineer

KTK Fujikura/ TOMEN

Essential duties and achievements:

  • Designing outside plant work orders, providing administrative and field support to the outside plant provisioning process and be familiar with the various communications outside plant engineering concepts, such as copper cable, fiber optic cable in duct, direct buried and aerial application.
  • Prepare a quotation on the supply, installation, testing, and commissioning of fiber optic interconnection system.
  • Utilize facility analysis process to select areas for rehabilitation, coordinate field work, preparation of work order drawings and documentation updating work order records in an accurate and timely manner, analysis of reports, providing work order estimated expenditures and/or placement and joint use memos.
  • Supervise and manage contractor operations, and onsite construction of telephone facilities.
  • Perform materials takeoffs and create materials requisitions. Develop scope of work for construction operations and issue request for quotations.
  • Experience in infrastructure plans (highway, sewer, bridge, etc.) and survey information for the elimination and prevention of conflicts with existing or proposed underground, site obstacles, and for proper installation location within easements and public right of way. Knowledgeable with all municipal and governmental requirements for all work.
  • Preparing Bill of Materials.
Aug 1995 - Feb 1997

Assistant Planning Engineer

FILTECH Services Inc. - ERICSSON Phils

Essential duties and achievements:

  • Analyzes traffic loads, available and existing lines, and estimates or forecasts of projected traffic to determine new construction or rearrangements and removals required.
  • Initiates work authorization request and submits request with substantiating drawings and documents to management for approval.
  • Furnish design for Loop Electronics/Digital Loop Carrier and Fiber in the Loop systems.
  • Making a complete field survey of the area to be planned. Collecting geographical maps of the area concerned
  • Checking the accuracy of the existing maps and carries out necessary changes. Conduct a complete property registration utilizing an adequate property classification method.
  • Prepare demand forecast studies to expedite the optimization of detailed networks designs for the provision of both primary and secondary network.
  • Identify the network requirements over a certain time span in accordance with the demand forecast (Fundamental Planning).
  • Prepare and negotiate for right of way (ROW) permit, outside plant facilities that entered private properties such as cabinet base, pole, anchor and guying.
  • Perform review of final construction drawings and make necessary changes. Ensure sign off of all parties involved.
  • Estimates equipment, labor, and material costs.


1989 - 1994


Polytechnic University of the Philippines

Passed Licensure Examination for Registered ELECTRICAL ENGINEER Duly Registered Professional Registration Date: July 12, 1995 Professional Regulatory Commission, Philippines License REE # 0005805

Activities and Societies: Regular member Institute of Integrated Electrical Engineers of the Philippines Inc. Membership No. 31623



Temps Link Planner

Map Info


Microsoft office

Operation of Windows XP / 2000 / 98 / 98SE

Pathloss 3 and 4

NetAct 4 and 5




LAN Technology

Meralco Foundation

Radyne Comstream Modem Training


CODAN RF Terminal Training


Repeater System Training

SMART Communications Inc

TransXpress – SIEMEN’S SDH Transport Products


Synchronous Multiplexer SMA 1K Series 3


Fundamentals of Data Communication


ECI XDM-100/ NMS Training


Fujitsu FRX2 SDH Microwave Radio & System Engineering Training


Engineering Economy and Finance Workshop

SMART Communications Inc

MSAP PHASE 4 LLD Tellabs 6345 & 6350


5817A Nortel Optical Multiservice Edge 6540 Broadband Operations and Maintenance


5695A Nortel Network Optera Metro Multi-Service Platform Series Operations and Maintenance 4100/4150/4200 & 6500