Over twenty years of working experience in oil and gas project which included major key assignment in offshore hook-up and commissioning (HUC) projects. The works entails familiarity with the stringent offshore regulations, safety regulatory system and offshore project management and controls, sound understanding of the basic startup, commissioning and operational needs and possessed in depth knowledge of 'commissioning driven' as the means of reducing the overall delivery period. Of these projects, all the preceding activities - that is, engineering, procurement and construction are directed not just towards the construction or mechanical completion but also must be aligned to ensure correct sequences for the specific commissioning and initial operations.
Assigned as Project Manager and Lead Engineer for the following projects, mainly to ensure contractual arrangements must be aligned to facilitate interfaces between construction, pre-commissioning and commissioning.

  • Company Site Representative, Petronas Carigali 2007 - 2016 (8 years) Bardegg 2 Brownfield Project PC4 Gas Development, Kinabalu NAG, Kumang Development - RM 200 Mil) 2000 - 2005 (4 years)
  • Electrical Specialist, Hook- Up & Commissioning, Platform Maintenance (Bekok C and PM9 Offshore Maintenance Projects - RM 25 Mil.)
    Project Engineer, RNZ Consultant2006 - 2007 ( 1 year) Project Management, Oil & Gas Design Sevices, Sabah Onshore Gas Terminal (SOGT), Dulang WAG Project Sarawak Shell2005 - 2006 (1 year)
  • Electrical Commissioning Engineer, Central Luconia Rejuvenation Project Petra Resources2000 - 2001 (1 year)Exxon-Mobil Offshore facility redevelopment projects- Irong Barat (IBA), Tapis D. Orbtech Eng.1999 - 2000 (1 year)BASF - Petronas Syngas Plant, Gebeng (E & I Contract worth RM 20 Mil)
  • Construction Manager -Kokusai Keiso 1998 - 2000 (2 years) Oil & Gas Construction - Exxon-Mobil Refinery, Port Dickson and KLCC Gas District Cooling Plant (RM 12 Mil.)
  • Project Engineer, Dialog Holdings1996 - 1998 (2 years) Oil & Gas Construction - Petronas Fuel Bunkering Facilities, Malaysian Acetyls Project, BASF Plant
  • Electrical Engineer, Sabah Shipyard1992 - 1996 (2 years) Oil & Gas Fabrication - Dulang-D Topsides, Lawit A (Exxon-Mobil), Self Erecting Drilling Tender Barge
  • Maintenance Engineer, Ryoka (M)1989 - 1991 (3 years) Plant Maintenance, automatic controls

Work History

20072016

Company Site Representative / Sr. HUC Engineer

Petronas Carigali Sdn Bhd

Assigned as hook-up & commissioning (HUC) senior engineer based in KLCC office, fully responsible for the strategic implementation of entire offshore hook-up & commissioning contract. Also responsible as Commissioning Strategist and Electrical Specialist, amongst key responsibilities included:
• Project Management and Contractor supervision • Electrical Testing & Commissioning • Marine Spread bid preparations and evaluations • Manpower management • Overall project management (offshore activities & marine support) • Project closure report • Reporting to department head • Overall management of PC4 HUC activities until hand over to Operation • Bardegg2 Development Project • Company Site Representative

20022005

E & I Commissioning Engineer

Petronas Carigali Sdn Bhd

Assigned as hook-up & commissioning engineer based in KLCC office, fully responsible for the strategic implementation of E & I hook-up & commissioning contract activities offshore. The scope of installation & commissioning included gas turbine compressor (Solar/Ingersoll-Rand), dual fuel system upgrading for turbo generator 800 kVA (Solar), compressed air system, load shedding, motor controller, instrumentation upgrading, electrical system and updating as-built drawings. Reporting directly to section head, involved directly in all areas of engineering review, interface coordination, preparation, planning, progress reporting, troubleshooting, start-up commissioning and supervision on offshore contractors & vendors performance. The works listed below were completed successfully: • Bekok-C debottlenecking project was successfully handed over for operation May 2003.. • Erb-West redevelopment project was successfully handed over for operation January 2004. • West Natuna redevelopment project was successfully handed over for operation January 2005.

20062007

Rnz Consultant

Oil & Gas Design Sevices, Sabah Onshore Gas

RNZ Consultant (1 year) Project Management, (SOGT), Dulang WAG Project Sarawak Shell 2005-2006(1 year) Electrical Hook-Up & Commissioning, Central Luconia Rejuvenation Project

20012002

Maintenance Engineer

Petronas Carigali Sdn Bhd

Based in PCSB Kerteh regional office this special task provides supports for offshore operations, and responsible for conducting studies and realization of facilities upgrading & modifications for platforms located within PM-9 field. This job function is specific and part of overall strategic planning ensuring support from shore base for offshore contract operations. The scope of responsibilities as per the followings: • Platform Bekok-C maintenance focal person reporting directly to area operations manager • Managed electrical & instrument system upgrading projects which included engineering details preparation, budgetary and strategic planning • Prepared operation and maintenance manuals for Bekok-A platform • Realization of fire & gas alarm system upgrading project for PM-9 platforms • Realization of soft starter applications for crude oil & condensate pumping system for offshore production • Realization of flare tip upgrading involving field removal, installation, trouble shooting, start-up commissioning and hand over to operation • Reviewed plant change request and carried out cost estimation and budget proposal • Involved in the start-up commissioning & hand over for full operation inclusive system acceptance dossier.
Petronas Carigali Sdn Bhd

2005-052006-05

E&I Commissioning Engineer

Sarawak Shell

Central Luconia Rejuvenation Project) E&I Commissioning Engineer Assigned as Electrical & Instrumentation Commissioning engineer based in Miri office and held full responsibility for the implementation of E&I hook-up & commissioning contract activities offshore. The scope of works covers all areas of the followings:- Engineering review, procedure writing Interface coordination & preparation Electrical testing & Commissioning Progress reporting Troubleshooting Start-up commissioning Supervision of contractors or vendors, and System acceptance dossier Involved in the commissioning & hand-over activities for platforms E-11 and F-23 rejuvenation project. This included procedure writing, start-up planning, fault findings for fire & gas detection system, plant shutdown system and DCS monitoring.

2003-052004-01

Commissioning Engineer

The works

listed below were completed successfully: Bekok-C debottlenecking project was successfully handed over for operation. Erb-West redevelopment project was successfully handed over for operation. West Natuna redevelopment project was successfully handed over for operation January 2005.

2002-092005-04

E&I Commissioning Engineer

Petronas Carigali Sdn Bhd

E&I Commissioning Engineer (Seconded from EP Engineering) Assigned as hook-up & commissioning engineer based in KLCC office, fully responsible for the strategic implementation of E&I hook-up & commissioning contract activities offshore. The scope of installation & commissioning included gas turbine compressor(Solar/Ingersoll-Rand), dual fuel system upgrading for turbo generator 800 kVA(Solar), compressed air system, load shedding, motor controller, instrumentation upgrading, electrical system and updating as-built drawings. Reporting directly to section head, involved directly in all areas of engineering review, interface coordination, preparation, planning, progress reporting, troubleshooting, start-up commissioning and supervision on offshore contractors & vendors performance.

2001-092002-09

Maintenance Engineer

Petronas Carigali Sdn Bhd
Maintenance Engineer (Seconded from Cito Petroleum) Based in PCSB Kerteh regional office this special task provides supports for offshore operations, and responsible for conducting studies and realization of facilities upgrading & modifications for platforms located within PM-9 field. This job function is specific and part of overall strategic planning ensuring support from shore base for offshore contract operations.
2000-092001-09

Project Engineer

Petra Resources Sdn Bhd
Project Engineer Assigned as Project Engineer for offshore platform retrofit contracting package Exxon-Mobil Malaysia. Significant contributions included the completion of Exxon-Mobil offshore retrofit projects known as Irong Barat A(IBA) redevelopment project phase II and Tapis D redevelopment. The scope of responsibilities and achievement included the followings:- Developed project execution strategy based on consolidation of recommendations and findings jointly developed by the construction team, design engineers and Exxon-Mobil. Prepared shutdown execution strategy emphasizing on careful planning to ensure zero interruption and minimum shortfalls during shutdown During implementation, monitored closely and managed the works to ensure satisfactory completion of hook-up & tie-in activities without major complications. Achieved target to complete the replacement of carbon steel firewater pipeline and deluge system at IBA with duplex piping in timely manner without compromising safety In charge of overall strategic planning, which included involvement in the overall start-up commissioning, hand over procedure, sourcing of equipment, manpower resources, materials and compilation of technical dossier.
20002005

Electrical Specialist

PC4 Gas Development, Kinabalu NAG
Kumang Development-RM 200 Mil. 4 years) Electrical Specialist, Hook-Up & Commissioning, Platform Maintenance(Bekok C and PM9 Offshore Maintenance Projects-RM 25 Mil.)
1999-122000-08

Senior Project Engineer

Orbtech Engineering Corporation Sdn Bhd

Senior Project Engineer Assigned as E&I Senior Project Engineer for the construction of BASF Petronas Syngas Plant located in Gebeng, Kuantan. The E&I construction covers above ground & underground cabling, low & high voltage switchgears, motor controls, flare ignition system, overhead crane, tubing installation, metering, fire & gas system, plant monitoring & control system, process control devices, pumping system, electrical grounding, UPS, diesel generator etc.

19992000

Construction Manager

KOKUSAI KEISO

Responsible for electrical & instrumentation installation and commissioning for KLCC gas district cooling project (April 99 ~ October 99) & upgrading of Exxon-Mobil refinery for multi-pipeline pumping system (Aug 1998 ~ March 1999). The  scope included various applications including field control instrument, pneumatic, shutdown system, CCTV, boiler system, heat recovery system, gas turbine compressor, metering, sampling system, water treatment system etc.
•    Managed and controlled liaison with clients including meetings, discussions, correspondence and dealing with governing bodies
•    Planned and prepared systematic progress reporting agreed by client site representative ensuring smooth progress claims.
•    Coordinated interface coordination to minimize interference complications.
•    Managed and coordinated meetings with contractors, making proposal for solutions of problems and ensured conformance to project requirements
•    Coordinated QA/QC system inclusive commissioning of equipment, functional checks, and prepared system acceptance dossier.
•    Involved in the start-up and commissioning activities including trouble shooting and vendors coordination

custom dated section

Lead E & I Engineer / Project Electrical Engineer/ Commissioning

Coordinated well as key team member and successfully managed interfacing between various engineering disciplines such as piping, mechanical, electrical and instrument. The E & I construction covers installation and commissioning of radar type tank gauging, field control instrument, crude oil pumping system, motorized operated valves, blending system, shutdown system, custody transfer metering, loading arm, pneumatic system, fire alarm, L.V switchgears, transformer, PLC based plant monitoring, CCTV, diesel generator, diesel fire water pump etc. The scope of experiences included the followings:
•    Prepared E & I works package for subcontractor to enter bid and
•    Prepared construction schedule, strategic planning, manpower planning and materials requisition package
•    Reviewed works procedure, coordinated, supervised E & I works carried out by contractors/ vendors
•    Coordinated and assisted vendor in establishing PLC philosophy and functional requirements
•    Involved in the start-up and commissioning activities that include troubleshooting, coordination of vendors, witnessing and reviewing detailed method statement and performance test results indicating the sequence timing and maintained functional records for each system.
Invoved as key personnel for the following projects:
•    December 1997 to August 1998, Field Electrical Engineer for Malaysian Acetyls Project a joint venture between BP, Petronas and Kvaerner
•    June 1997 to December 1997, E & I engineer for Kerteh Centralized Tankage Facility Project (KCTF) a joint venture between Petronas, GATX & Dialog Holdings
•    March 1996 to June 1997, invoved as lead E & I engineer for Petronas Bunkering Facilities Project located in Pulau Indah, Wesport, Pelabuhan Kelang