Asitha Bandaranayake

  • Nagolla

Work History

Work History
Apr 2011 - Aug 2014

Building Services Consultants Pvt

Building Services Consultants Pvt
I have been working at) Ltd.,(A leading MEP Design Consultants) as a Sr.Project Engineer from. q I had been working at How United Services, Doha Qatar(One of the group company of Interserve Group(UK) and has the joint venture with Al Darwish United Company in Qatar. Company has been practicing in the Qatar for over a fast decade as MEP contractor specializes in Electrical, HVAC, Fire and security system design and contracting company) as a Mechanical Engineer for Three years. A. Fit Out Department-Doha('-March 14') Fully experienced in all types of HVAC systems Designing, Installation, and Testing & Commissioning of MEP systems and Maintenance with associated control systems according to ASHRAE and international standards of engineering. q
Oct 2010 - Jan 2011

Project Manager

A. Regional Development Project Phase II-Maldives
Position: Project Manager: Studying contract documents and conditions, preparing construction schedules, budget control and material ordering
Jul 2009 - Oct 2010

Hvac Engineer

Project-Sri Lanka
B. Anuradhapura Teaching Hospital ' Position: HVAC Engineer: Installation and testing commissioning of Air conditioning, ventilation system and Medical gas System
Dec 2008 - Jul 2009

Mechanical Engineer

Business and Engineering Department-Shin Nippon
Position: Mechanical Engineer in Estimation & Tendering Preparing Estimate Orion Factory Building-Sri Lanka Water Cooled Package AC System(350 RT) Preparing Estimate for Solomon Hospital Project-Solomon Island Split AC system, Ventilation System and Plumbing System Preparing Estimate for Dammika Perera Residence-Sri Lanka VRV System(50RT) and Ventilation System, Plumbing System Preparing Estimate for 2 Island Sewerage Treatment Project-Maldives Fonadhoo Island(290m3/day) and Mahibadhoo(305 m3/day) q
Jul 2008 - Dec 2008

Project Manager

Project-Sri Lanka
C. Stassen Renovation Project-Colombo, Sri Lanka(') Position: Project Manager: Installation and replacing 2 no. of PAC units and one cooling tower.
Dec 2007 - May 2008

Mvac Engineer

D. Setmil Development Project-Mattakkuliya
Sri Lanka(') Position: MVAC Engineer Installation of Air conditioning system, Fire Sprinkler & Hydrant System & Plumbing System
Apr 2007 - Oct 2007

Mechanical Engineer

D. Setmil Development Project-Mattakkuliya
E. Palm Jumeirah Marina Apartments Project-Dubai, UAE(') Position: Mechanical Engineer Preparing Shop drawings & coordination drawings, technical Submittals. Taking off the quantities for equipment & material ordering. Arrangement of Chilled water pipe and duct installation
Jul 2006 - Mar 2007

Site Manager

YKK
F. Factory Expansion-Seethawake, Sri Lanka(') Position: Site Manager Installation of compressed Air piping, steam Piping, and Hot water piping. Installation of Oil Mist Exhausts System and Package AC units
Dec 2004 - Jul 2006

Mvac Engineer

G. National Blood Transfusion Services-Sri Lanka
Position: MVAC Engineer Installation and testing commissioning of First Thermal Ice Storage system in Sri Lanka, Two Ice storage tanks(Storage capacity 660 RT), two water chillers Capacity 90 RT) and one Brine chiller(Capacity 99RT). 127 Fan coil units(Included Ceiling Suspended, Ceilling cassette & Ceiling concealed type FCUs) Seven Air Handling Units with duct system. Exhaust and Ventilation system, Three Cold Rooms for Blood storage Duties & Responsibilities System Designing and preparing shop Drawings Taking off the quantities for preparing BOQs Preparing estimations, Variation order and progress claims. Preparation of technical submittals for consultant/client approval Procurements and logistic works Project Planning and Scheduling Conducting & attending Site Meeting Coordination with consultant, subcontractors and suppliers Preparation of Operation & Maintenance manuals Testing & Commissioning of the systems Involving operation & maintenance during the Defect Liability Period q