Anandarajaprabu Krishnamoorthy

  • Tirunelveli Tamilnadu
Anandarajaprabu Krishnamoorthy

WELDING/ NDT INSPECTOR

Skills

Skills

Welding Inspection

NDT Inspection

Test Package

Inspection

Piping

Handover & Completion

Work History

Work History
Apr 2013 - Present

Ndt Specialist

Kellogg Brown & Root

ORGANIZATION: PROJECT: LNG Ichthys project DESIGNATION: NDT Specialist PERIOD: Key Deliverables Handled the Project from Beginning to End of Fabrication. Involved in qualifying all Weld Procedures for this Project.(More than 60 including Repair) Involved in qualifying all Welders working in this project.(More than 1000 in various process) In Charge for overall NDT activities in Project.(UT, RT, MPI & PT)

Jul 2012 - Feb 2013

Mechanical /welding Inspector

VELOSI CERTIFICATION LLC

ORGANIZATION:. IRAQ PROJECT: SHELL IRAQ PETROLEUM DEVELOPMENT DESIGNATION: MECHANICAL /WELDING INSPECTOR(SHELL APPROVED)

Role as a Third party Inspector in SHELL MAJ NOON OIL FIELD. for ü Raising NCR's to Contractors for Quality Deviation

PERIOD: (Short term Project) Key Deliverables ü Witnessed Flange final Torqueing as per sequence given in procedure. ü Reviewing Test package documents. ü

Sep 2010 - May 2012

Welding Inspector

KHARAFINATIONAL COMPANY LLC

ORGANIZATION:. ABUDHABI PROJECT: HABSHAN 5 PROJECT DESIGNATION: WELDING INSPECTOR(GASCO APPROVED) PERIOD: Key Deliverables ü Preparation & Qualification of Welding Procedures & Welders for CS, AS, SS, Materials as per ASME, AWS & API codes. ü Witnessing of welder qualification tests for SMAW, GTAW, and FCAW etc. ü Inspection of welding consumables like electrodes, filler wire, flux, shielding gases etc. as per the specification/mill certificates, before Issuing for construction. ü Preparation, Review of NDE Procedures & Interpretation of weld discontinuities by various NDT methods like RT, UT, DPT, MPT & Visual Examinations as per code requirements. ü Radiography Film Interpretation.

May 2010 - Sep 2010

Third Party Mechanical Inspector

GERMANISCHER LLOYD INDUSTRIAL SERVICES

ORGANIZATION: (GmbH) PROJECT: GGSSR REFINERY PROJECT DESIGNATION: THIRD PARTY Mechanical INSPECTOR PERIOD: Key Deliverables ü Witnessing the PQR, test results, train the welders to follow the WPS effectively through welder orientation programs ü Reviewing of welding procedures specification(WPS) and procedure qualification record(PQR) ü Involved in preparing welder performance test record and welder ID card ü Instrumental in piping inspection with respect to internal and external alignment, root gap bevel angel, Groove angle as per approved drawings, applicable WPS, project specifications ü Especially witnessed Nondestructive testing of pipes, piping welds, structurals: T, K, Y joints etc

Sep 2008 - Mar 2010

Qc Inspector

NASSER S AL HAJRI CORPORATION (KSA)

ORGANIZATION: HAJRI CORPORATION(KSA) PROJECT: SABIC PETROCHEMICAL PROJECT DESIGNATION: QC INSPECTOR(Approved by SABIC) PERIOD: Key Deliverables ü Accountable for inspecting the materials regarding Traceability, Physical condition and drawing requirement ü Monitoring calibration status of welding machines, Inspection tools, ü Witnessing the NDT methods and PWHT process, surveillance of welding parameters/consumables for compliance with WPS. ü Responsible for brainstorming the welder about the techniques to improve quality

Aug 2007 - Sep 2008

QC Engineer

UB ENGINEERING LIMITED

ORGANIZATION: ENGINEERING LIMITED PROJECT: ESSAR EXPANSION PROJECT DESIGNATION: QA/QC Engineer(STRUCTURAL) PERIOD: Key Deliverables. ü Fabrication & Erection Inspection of various welded heavy steel structures such as crane girders, columns, galleries & beam ü Visual inspection of final weld profile. ü Witnessing the NDT methods and PWHT process

May 2005 - Jul 2007

Qc Engineer

NEO STRUCTO CONSTRUCTION LIMITED

ORGANIZATION: PROJECT: RELIANCE REFINERY PROJECT DESIGNATION: QC Engineer(PIPING & WELDING) PERIOD: Key Deliverables. ü Following ITP, WPS & other work procedures. ü Inspecting Joint Configuration of Fit up prior to weld as per WPS. ü Surveillance of welding parameters/Consumables for compliance with WPS. ORGANIZATION: PRASANTH PROJECTS LIMITED PROJECT: HINDUSTAN PETROLEUM CORPORATION LIMITED(LONI)

Mar 2003 - Apr 2005

QC Engineer(PIPING & WELDING

PRASANTH PROJECTS LIMITED

DESIGNATION: QC Engineer PERIOD: Key Deliverables ü Monitoring calibration status of welding machines, Inspection tools, Quivers, Witnessing the welder qualifications ü Brainstorming the welder about the techniques to improve quality. ü Coordination with the client during quality Walkthrough.

Jul 1998 - May 2000

TRAINEE

TEXEL ENGINEERS PRIVATE LIMITED

Key Deliverables ü Review the test certificate of filler metal and consumable, shielding gases as per wps. ü Review the mill test certificate of materials being used at site with respect to heat number, material type as per the associated design data and drawings, etc. ü Reviewing of welding procedures specification(WPS) and procedure qualification record(PQR). ü Witness to the welder qualification test(6G, 4G, 3G, 2G) and monitoring all parameter as per wps(current, voltage, traveling speed) Accomplishments ü Successfully reduction of welder repair rate by conducting the welder orientation program ü Assured quality by making effective hold points particularly in T, Y, K joints ü Successful implementation of routing for documentation for sustainable growth with ISO auditing ü Effectively leading the quality control team to reduce loss and increase gain by arranging proper training.

Education

Education
Jul 2008 - Present

ASNT LEVELII IN UT,RT,MPI,PT & RTFI

HITECH INSTITUTE
Apr 2010 - Present

CERTIFIED WELDING INSPECTOR

AWS -CWI

Jul 1995 - Mar 1998

Diploma In Mechanical Engineering

Sankar Institute of Polytechnic 

Mechanical Engineering.

Portfolio

References

References

MR.DAVE WALKER, QUALITY ASSURANCE MANAGER, SHELL MAJNOON OIL FIELD,MOB:+964 7809 177 523 Email:david.walker@shell.com

Mr. Kevin Leonard

Kevin Leonard RFT Manager/Completions Coordinator Tel. : 0063 43 740 5900 6123 Mobile. : 0063 917 843 9349 Email. : Leonard.Kevin@jkc-mf.com

Portfolio