Facilities Management & Engineering – Maintenance Management – Project Management

Accomplished leader offering comprehensive expertise in facilities management and engineering with experience delivering full service maintenance management and ensuring high staff performance and reduced costs. Background encompasses the management of janitorial and ground maintenance including operations of utility systems and equipment as well as security.

Work experience

Jul 2014Present

Facilities and Maintenance Manager

TATA Consulting Engineers Limited

6 X 600 MW Duvha Power Station (ESKOM), South Africa

  • Responsible for the planning and control for the execution of a brown field development, including a field integrity upgrade and field capacity improvement of the existing unit.
  • During the execution phase of involved in all project management related functions, including estimating, planning and scheduling, risk analysis, cost forecasting and economic appraisal.
Jun 2013Jul 2014

Facilities and Maintenance Manager

TATA Consulting Engineers Limited

10 X 200 MW , Hendrina Power Station(ESKOM),South Africa

  • The preparation of an integrated corporate project planning, including the preparation of a detailed requirements specification, installation specification and management plan for the effective management and execution of Outage/Shut-Down projects.
Sep 2012Jun 2013

Senior Project Control's Engineer

TATA Consulting Engineers Limited

TATA Steel, Kalinga Nagar

  • Planning and scheduling for the construction of 440kV/220kV transmission line works, 220kV switchyard bay extension, construction of 220kV switching station, electrical works for 7 nos. power distribution buildings which also includes 4 nos. Gas Insulated Switchgear.
  • Preparation of quality plans for setting out specific practices and activity scope definitions together with the identification of key quality activities for the integration into major project developments. Monitoring and reporting project progress trends, performing scenario analysis and suggest recovery measures for projects.
  • Detailed, joint planning with key stakeholders, subject matter experts and management to create finite scope solutions which incorporate current resource and constraints and result in realistic schedule with criticalpath.
Nov 2011Sep 2012

Project Management  Consultants

TATA Consulting Engineers Limited

BASF India Limited, Mangalore

  • Responsible for all aspects of installation , commissioning ,cost control, planning, contract administration and co-ordination for the construction of a new Chemical Plant Factory.
  • Worked as Quasi Project Manager for the project.
  • Directed planning, budgeting, vendor selection and quality assurance efforts.
  • Monitored timelines and flagged potential issues to be addressed.
  • Defined clear targets and objectives and communicated them to other team members.
May 2009Mar 2011

Senior Engineer

TATA Consulting Engineers Limited

TATA Power Solar, Bangalore

  • Carried out the installation and commissioning activities for the construction of a cell Manufacturing unit of capacity 4 X 32 MW per annum. It also required the necessity of Utility plant like Ultra Pure Water with resistivity of 18M-Ohm, Pure air plant, Compressed dry air, speciality gas plant, scrubber system
  • Spearheaded the Electrical Execution team, resulting in successful and timely completion of project.
  • Directed planning, budgeting, vendor selection and quality assurance efforts.
  • Recommended process and systems improvements in Material Management and work execution.
  • Supervised the work of 4 team members, offering constructive feedback on their work performance.
Aug 2007Apr 2009

Electrical Engineer

TATA Consulting Engineers

Vedanta Alumina Limited, Jharsuguda

  • Electrical equipment's installation, quality checks and commissioning for Captive Power Plant of 9 X135 MW.
  • It included the construction of 220 KV Switchyard of 28 Bays, coal handling unit & Balance of Plant(Fuel pumping system, Cooling Towers, Deionized water).
  • Implemented a set of comprehensive tracking processes to monitor quality assurance and project progress updates.

Summary

  • Equipped with a strategic mindset that facilitates the formulation and implementation of strategies that have significantly improved preventative maintenance and cost efficiency.
  • Practiced in project and construction management including initial planning and scoping,scheduling, sourcing and procurement of materials and testing of integrated utility management systems.
  • Recognized as a builder and leader of high performance teams by engendering a culture of trust and collaboration and valuing ongoing training and development to build skills and professionalism.