Work History

Work History

Jan 2013 - 2015

Electromechanical Project Engineer

Fire & Water Electromechanical Co. W.L.L – (Tanfeez Qatar).

Handling a project complete electrical systems (conventional/addressable fire detection, smoke dumpers & clean agent fire protection FM200/CO2) and mechanical systems (wet fire protection, plumbing, sewerage, flushing water, irrigation, storm water & raw water).
Handling a project team work consisting of 3 foremen & up to 60 electricians, pipe fitters & labors beside store keepers, drivers & heavy equipments operators.
Revising projects contracts and modifying their terms & conditions according to my company capabilities.
Prepare projects time schedule, infancies main tasks to be executed & highlight unpredicted obstructions.
Prepare primary material take off according to client / consultant approved design drawing.
Prepare project method statement, material submittals for consultant approval according to project vendor list & QCS Qatar Construction Specification.
Establish a complete document control department in project site containing all project documents such as : (contract, method of statement, material submittals, design drawings, shop drawings, material inspections, installation inspection, as built drawings, official litters, daily reports, material cost sheets, financial invoices & other documents related to project) and preparing a document log sheet giving a reference number for each document.
Handling all material and work installation inspections with main contractor QC/QA representatives & project consultants.
Coordinate scoop of work with other subcontractors & main contractor to avoid future troubles in a very smooth & professional way.
Handling financial invoice submitting, reviewing & modifying (if required) with main contractor or client financial department in project site.
Handling final testing, commissioning & start up for installed systems in project.
Attending Qatar civil defense inspections for fire detection & protection systems installed by our company.
Handle all project issues and try to solve them till final handover to client.
Follow balance payment (retention) after receiving a completion certificate by main contractor.

Feb 2010 - Dec 2012

Electrical Site Engineer

Hydro for trading Co. W.L.L.

Handling a clean agent (FM200/CO2) fire protection system for a complete project.
Handling a project team work consisting of 1 foreman & up to 10 electricians, pipe fitters & labors beside site office employees.
Revising projects contracts and modifying their terms & conditions according to my company capabilities.
Prepare projects time schedule, infancies main tasks to be executed & highlight unpredicted obstructions.
Prepare primary material take off according to client / consultant approved design drawing.
Handling all material and work installation inspections with main contractor QC/QA representatives & project consultants.
Handling final testing, commissioning & start up for installed systems in project.
Attending Qatar civil defense inspections for fire detection & protection systems installed by our company.
Handle all project issues and try to solve them till final handover to client.

Jul 2009 - Jan 2010

Mechanical Site Engineer

Clarity for contracting Co.

Handling a project team work consisting of 1 foreman & 5 pipe fitters & labors.
Prepare primary material take off according to client / consultant approved design drawing.
Handling all material and work installation inspections with main contractor QC/QA representatives & project consultants.
Handling hydraulic test for installed piping network in project.

Jan 2009 - Jun 2009

Electrical Site Engineer

Watania Group of companies

Handling a project team work consisting of 1 foreman & 6 electricians, pipe fitters & labors.
Prepare primary material take off according to client / consultant approved design drawing.
Handling all material and work installation inspections with main contractor QC/QA representatives & project consultants.
Handling final testing, commissioning & start up for installed systems in project.

Nov 2007 - Dec 2008

Site Engineer & technical office

Tamkco International Co.

Handling a project team work consisting of 1 foreman & 10 electricians, pipe fitters & labors.
Prepare primary material take off according to client / consultant approved design drawing.
Handling all material and work installation inspections with main contractor QC/QA representatives & project consultants.
Handling final testing, commissioning & start up for installed systems in project.

Education

Education
Sep 2001 - Jul 2007

Bachelor of Science in Engineering B.S.E

Misr University for Science and Technology

Major: Electronics & Communication

Qatari 5 years work visa (2010 – present) acquired.
Certified as an Electrical Engineer by Qatari Ministry of Urban Planning
Certified as a Fire Detection Engineer by Qatari Civil Defense Department
Qatari & Saudi Driving License Acquired
Member of Egyptian Engineers Syndicate

Skills

Skills

Installing, start up, testing & commissioning for (potable water, flush water, storm water, irrigation & sewerage) systems.

Installing, start up, testing & commissioning for clean agent system (Fenwal) brand.

Installing piping network for Swimming Pools & Artificial Lacks & Making takeoff for required (material, pipes, fittings & accessories) for mentioned systems.

Installing Fire protection & detection systems (Notifier) brand.

Installing Fire protection & detection systems (Tyco) brand, CCTV (AV Tech & Pelco) brands & security system (Bentel & Texecom) brands, Drawing (design &as built) for mentioned systems with AutoCAD system 2D, Making hydraulic calculation for FM200 sys (Tyco) brand & Making takeoff for required (material, pipes, fittings & accessories) for mentioned systems.