Experience: +16 Years (1998 till present)
Department: Information Technology Group (ITG)
Designation: IT Managing (Hardware Section Supervisor)
Reporting to: IT vice President, IT Directors
Website: www.drsulaimanalhabib.com
Plans & Projects
• Queuing System analysis & Implementation
• Video Conferencing implementation & managing
• Digital Signage Infrastructure & Planing
• PACES implementation
• Bio metric and smart card Implementation.
• Help desk application analyzing Implement
• Organizing IT equipment enhancement
• Medical Lab (MD) Infrastructure & Implementation
• Pharmacy Check point Implementation.
• Data information Kiosk Implement & Support
• Reconstructed P.O.S Plan & Implement
• Bio-medical connectivity with IT analysis & Implement
• JCIA and Sbahi solution as team
• Inventory control IT stock Plan with Infrastructure
• ERP Training Implement
• Technical training for Saudi Engineers Solution
• Bar-coding system for Patient ID band Implement and Support
• Print management solution plan
• Maternity identification Solution plan
• Online booking auditorium Solution plan
• Nurse Call System plan
• Document contract management plan
• Balding Management Plan & Reporting.
Administrative responsibility/ Authority
IT Infrastructure:
As advancement in IT infrastructure accelerate, it is critical that your IT system are aligned with
your business needs. Enter company rely on our strategic thought leadership.
Feedback for repairing
Technical reports include various types of "technical" information. Reporting and diagnosing the
equipment failed, many reports have different classification as technical reports.
Analysis & Strategy to Selection equipment’s
The alternative method for maintenance strategy selection is to use a bottom up approach such as
Failure Mode and Effects Analysis to select appropriate strategies and practices to maximize
equipment reliability.
Acceptance certificate equipment’s
Signing of the final Acceptance to shall certify that the work contained in the subject to contract
has need inspected by the parties and installed. The financial authority are approve
Technical Authority
Variability stock on handled, with variations from listed inventory. Each piece will go through logistic
Control opinions and if found to be substandard, Selection for warranty equipment’s