Mechanical Engineer with 25 years of experience in the Petrochemical, Oil and Manufacturing industries of Venezuela in the areas of Execution and Planning of Maintenance and Construction sites; as well as the development of Conceptual, Basic, Detailed and IPC engineering projects. In the Maintenance area I have developed abilities for the execution of preventive and corrective maintenance of static and rotative equipment. Besides coordinating the electrical, electronic, technical and production departments activities in order to achieve the repairs  and/or changes needed.

Wide experience in SAP-PM management system, pre and commissioning of processing plants and  planning of turn arounds and overhauls (activity where I got excellent results in quality and safety). In the Engineering area I have developed Conceptual, Basic and Detailed engineering projects of water treatment plants, gas compressor and dehydrator  plants onshore and offshore, flow stations, fuel distribution plants, poliducts, etc. I have shown domain and ease in the execution and maintenance processes, as well as maintenance techniques in turn arounds and overhauls.

Great executor of engineering projects and budget elaboration and control, also maintenance of facilities and equipments. Great leader, inspire and spread enthusiasm among the peers inside and outside of the company, in order to fulfill desired goals and objectives. I possess a high level of responsibility and commitment with the company, major team worker and amazing skills to create an effective synergy among the members of the team, good learning skills and initiative.

Work History

Work History
Mar 2005 - Present

Engineering Manager

PCI Ingenieros Consultores S.A

Responsible to lead a multidisciplinary team in order to meet the goals of execution of the engineering projects to public and private industries, nationally and internationally in the fields of oil, gas, etc.

Oct 2004 - Oct 2005

Project Supervisor

Industria azucarera Santa Elena

Responsible for the completion of the construction of a boiler capacity 56 ton / hr , BAGASSE type to increase the steam supply to the plant for obtaining sugar .

May 2004 - Jun 2004

Mechanical Specialist


Responsible for the implementation of the replacement of bank of pipes E - 4114 ( executed for the first time in plant ) coordination of work linked to repair of duct U -4101 ( extra work ) in the reforming furnace, using human resources and special equipment moto- crane as 300 ton , transport, qualified personnel.

Responsible for the implementation of the replacement WHB boiler E -4120 a / b, coordination of work associated with activities of heat treatment, cut, special welding recovery of rings with severe housing damage, non-destructive testing (iv , tp , pm and rx ) of the refractory container, dump and drying using human resources as; international contractor cust -o - fab and special equipment cranes as 2 150 ton . It notes that the management enabled timely starting the oven reformer E -4101 and achieve the goal of zero accidents.

1990 - 2002

Superintendent of Maintenance


 Coordinate and direct the mechanical, electrical and instrument of Gas plants ( LGN I / II , purifying Ethane Plant) Maintenance , Olefina ( Olefina I / II ) and Industrial Services of the El Tablazo Petrochemical Complex through programs of preventive maintenance , plant turn around and overhaul, priorities and resource management to contribute to the continuity and operational reliability thereof. Applying the techniques of reliability centered maintenance (MCC ) .Responsible for supervising 54 people including 9 engineers and 44 technicians and craftsmen . To ensure strict compliance with all aspects of safety and Environment (HSE ) staff that make up the section and planning their career development within the organization .


1984 - 1991

Mechanical Engineer

Universidad Central de Venezuela (UCV)
1995 - Present

Plant Engineering Specialist

Universidad del Zulia (LUZ)