Interests

  • Building automation
  • Power Electronics Product design
  • PLC & SCADA

Academic Projects

  1. Desertion (Jan 2015): Grid connected Hybrid Micro grid stability Improvement
  2. Live Project (June 2009): Anti Accidental Device for Electrical vehicles

Keywords

  • Project & Manpower Management.
  • Testing & Installation
  • Project Planning
  • Material Procurement
  • Measurements & Billing
  • Sales/ Purchase Support
  • Leadership/ Team Skills
  • Communication Skills
  • Documentation Skills
  • Schedule Awareness/ Commitment to Task
  • Electrical Design & Computer

Skills

Skills

Project Skills

  1. On site Inspection, Testing and commissioning of UPS, Inverter, Panels, DB, power and lightings systems.
  2. Negotiation with Clients and contractors diplomatically.
  3. Power Distribution Panels and Boards, 33/11 KV Substation with pole and line arrangement commissioning and installation.
  4. Cables routing and scheduling, Building and Outdoor lighting, Electronic utility Equipments erection.
  5. Ability to read floor plans, sections and elevations
  6. Knowledge of Cable sizing, Fault analysis, short circuit studies, Switchgear and equipment selection. Earthing & protection
  7. Testing and commissioning of Panels, DB, power and lightings systems.
  8. Works to estimate schedule and assigned manpower for tasks completion.
  9. Project management, Quality control, project execution, Testing and commissioning as per approved drawing and referred IS Codes & Internal Standards.

Power Electronics & Design

  1. Knowledge of AC and DC Motor Control with Analog and Digital Interacting.
  2. Student level experience on NI Multisim 13.0, Spice Orcad, AutoCAD.
  3. Knowledge of PIC Microcontroller Architecture & Programming.
  4. 16-Bit PIC Microcontroller Architecture & Programming.
  5. Hand on experience on MATLAB R2012a, SIMPOWER
  6. Knowledge of PCB Layout Designing and routing.

Communication Skills: (English, Hindi, Marathi)

Responsible representative of the company in all interactions with clients, contractors and design coordination between other project members.

Monthly and weekly reporting project progress & activities to higher authority.

Schedule Awareness/Commitment to Task

Completes all assigned tasks within the time and budget allocation. Reporting Project manager of any significant events that would affect project schedule completion.

Leadership/Team Skills

I am a Strong team builder with proven ability to motivate team members, sub-contractors towards achieving production targets in my previous projects and contracts

Education

Education
Aug 2012 - Jun 2015

Master of Technology

Vedica Institute of Technology (RGPV Bhopal)

Power Electronics, GPA 8.40

Jun 2006 - Jun 2010

Bachelor of Engineering

Oriental Institute of Science and technology (RGPV Bhopal)

Electrical and Electronics Engineering, 1st Grade, 67%

Work History

Work History
Dec 2011 - Present

Electrical Contractor

Self Employed

Managed all project related activities, Bidding, Tendering, Procurement of workers & Materials, Measurements, Billing etc. Managing work execution to maintain highest standard of Quality workmanship, execution methodologies as well as materials procured, as per drawing and referred Standards.

Aug 2011 - Feb 2013

Assistant Electrical Engineer

BLOOM COMPANIES LLC

Inspection of 11/33 KV pole and substation installation. Power distribution, planning, Upgradation of old line, Earthing at different location for substation & building panels. Ensuring highest standard of Quality in materials & execution methodologies, as per drawing/ referred IS Codes. Design Coordination ,wire looping, Cable scheduling, sizing & fittings layout designing.

  • Achievements: Assisted my head drawings correction & revision for entire 24 Border Project Projects
Jul 2010 - Aug 2011

Electrical Project Engineer

MEP

Managed all project related activities like Execution, Installation, Testing, commissioning, Measurements & Billing etc. Looked after Lighting, power point wiring Point wiring, Cable lying, Cable Scheduling and Installation in Cable Tray, Truncking.  Quantity analysis of all material using AutoCAD  and Purchase Order placement. Handing over and job closing of the Project

  • Achievements: Provided sound technical input and engineering support to contractor team from conception to completion stage of SPAR Hypermarket project with support of our project manager