Abdulrhman  Mouhish

Abdulrhman Mouhish

Work History

Work History
Mar 2013 - Present

 Site HVAC Engineer.

CLIMA UNO
  • Shatt Al-Arab Hotel MEP project :
  • Installation of air cooled screw chillers (270 TR capacit, Qty =4) including supports, valves and necessary accessories.
  • Installation of chilled water pumps including necessary supports, vibration isolators, valves and necessary accessories.
  • Installation of pressurization unit and chemical dosing system including necessary valves and accessories.
  • Installation of eight (Nos) fresh air handling units and twenty four (Nos) Air handling units.
  • Installation of (317 Nos) single skin type for ceiling suspended ducted fan coil units including Heaters, supports, vibration isolators, valves and necessary accessories.
  • Installation of (24 Nos) DX Split units including piping, supports and accessories.
  • Installation of CAV and VAV units.
  • Installation of chilled water pipe system including necessary valves and accessories
  • Installation of 7,000 m GI ducts including necessary all accessories and dampers "VCD, MVCD, FD, MFSD, BDD…etc."
  • Installation 2,000 m black steel duct for kitchen area and smoke extract fans.
  • Installation all types of Air outlets(linear bar grill, ceiling diffuser, exhaust disk valve…etc.).
Sep 2011 - Mar 2013

Mechanical engineer

PCC
  • Nobles project ( installation VRV system including copper pipe system and duct work )
  • Laboratory dental clinics at Al-Qalmoon University (installation AHU with Foam duct including all accessories)
  • Al-Zaeem Garage project.( installation exhaust fans system)
  • Syrian Women's Development Center of the United Nations.(installation duct split system)
  • Sewing plant ( installation heating system by boiler and heating coils)
  • Safa factory  (installation package unit)
  • Masa plaza Mall (installation Package unit)
  • Kiri factory (installation hood for kitchen).
  • Zenbakji factory (installation chimney for Biscuit production line )

Education

Education