Abdullah Oghli

  • Jeddah, Saudi Arabia Western Province

Work History

Work History
Jan 2013 - Present

Senior Project Manager @ SWCC TETRA Project

Advanced Communications & Electriconics Systems Co., Ltd.
• Civil, EM, & Telecom Scope. • Working in Civil Designs & get the approval from the customer. • Working in EM Designs & get the approval from the customer. • Matching customer requirements & standards. • Define the cost of the project. • Making the PIP of the project. • Arranging the civil contractors for the project. • Contacting & following up with the vendor ( Cassidian ). • TB3 ( TETRA base station ) Commissioning and Integration. • Calricor System organization. • Dispatcher,NM Client,Recorder,Playback,& WorkStations Commissioning. • Terminals Programming. • SAT preparing and performing. • Project Invoicing.
Jan 2011 - Dec 2012

Project Manager

Advanced Communications & Electriconics Systems Co., Ltd.
• Handling two engineers & 15 technicians in the project. • Define the cost of the project. • Put the perfect work plan & dead lines with the operators. • Give the priorities in the project. • Contacting & following up with the vendors ( Power Wave & Andrew ). • Solve all the technical problems in the site. • A good refernce for my manager for all active sites in KSA. including to :  Troubleshooting & Optimization for Active : • Working on Power Wave monitoring system ( Net Way Vision ), doing all necessary configuration and control all the units in the sites by using Microwave Network. • Installing AIMOS ( Andrew Monitoring system ) for all Andrew active sites. • UL & DL Optimization for the Active equipment for all bands. • Measure the noise figure for the UL. • Solve all Alarms which occured in the RUs. • Good relationship with the technichal engineers for Active vendors.
Sep 2008 - Dec 2010

RF Engineer

Advanced Communications & Electriconics Systems Co., Ltd.
My responsibility was to design & supervise RF projects (IBS, Outdoor) including: • Surveying the site to collect all the needed data for the Design. • Antenna allocation using propagation test. • RF design for In building Solution using Huawei (3900), Ericsson, and NSN (Ultra Sites/ Flexi) Equipments. . • Implementing the site by installing all the DAS (Distributed Antenna System), passive and active equipment. • Walk test, using TEMS. • Testing the coaxial cable using Site Master. • Installation and commissioning of NSN (FIU19) MW equipments • Installation & commissioning of Powerwave active system (POI, OCM, repeaters). • Installation of Huawei (3900), Ericsson (3206, 2964), and NSN (Ultra Sites/ Flexi) Equipments. • ISP installation between the Remote Unit and the Master Unit • Checking the line of sight in the field and apply it in Path loss program • Aligning the Microwave Antenna as per the transmission design • Attending Site Acceptance Test (SAT)


Sep 2001 - Sep 2008

Bachelor's degree

Albaath University

Electronics & Telecom Engineering 

Sep 1998 - Jun 2001

High School

Al Thagher High School











Microsoft Office


RF Engineering

RF troubleshooting

Telecommunications Engineering

Project Management

Technical Leadership

Computer Skills

Communication Skills


Jul 2010 - Present

Andrew : Mobile In-building active solutions

Andrew, Germany
Jul 2010 - Present

Commscope : optical fiber basics, transmission, and testing

Andrew, Germany
Sep 2008 - Present

Power Wave : Mobile In-building active solutions

Power Wave, Sweden
Aug 2014 - Present

• EADS Claricor system, TETRA.

AIR BUS, Spain