Abdullah Oghli

  • Jeddah, Saudi Arabia Western Province

Work History

Work History
Jan 2013 - Present

Senior Project Manager @ SWCC TETRA Project

Advanced Communications & Electriconics Systems Co., Ltd.
• Civil, EM, & Telecom Scope. • Working in Civil Designs & get the approval from the customer. • Working in EM Designs & get the approval from the customer. • Matching customer requirements & standards. • Define the cost of the project. • Making the PIP of the project. • Arranging the civil contractors for the project. • Contacting & following up with the vendor ( Cassidian ). • TB3 ( TETRA base station ) Commissioning and Integration. • Calricor System organization. • Dispatcher,NM Client,Recorder,Playback,& WorkStations Commissioning. • Terminals Programming. • SAT preparing and performing. • Project Invoicing.
Jan 2011 - Dec 2012

Project Manager

Advanced Communications & Electriconics Systems Co., Ltd.
• Handling two engineers & 15 technicians in the project. • Define the cost of the project. • Put the perfect work plan & dead lines with the operators. • Give the priorities in the project. • Contacting & following up with the vendors ( Power Wave & Andrew ). • Solve all the technical problems in the site. • A good refernce for my manager for all active sites in KSA. including to :  Troubleshooting & Optimization for Active : • Working on Power Wave monitoring system ( Net Way Vision ), doing all necessary configuration and control all the units in the sites by using Microwave Network. • Installing AIMOS ( Andrew Monitoring system ) for all Andrew active sites. • UL & DL Optimization for the Active equipment for all bands. • Measure the noise figure for the UL. • Solve all Alarms which occured in the RUs. • Good relationship with the technichal engineers for Active vendors.
Sep 2008 - Dec 2010

RF Engineer

Advanced Communications & Electriconics Systems Co., Ltd.
My responsibility was to design & supervise RF projects (IBS, Outdoor) including: • Surveying the site to collect all the needed data for the Design. • Antenna allocation using propagation test. • RF design for In building Solution using Huawei (3900), Ericsson, and NSN (Ultra Sites/ Flexi) Equipments. . • Implementing the site by installing all the DAS (Distributed Antenna System), passive and active equipment. • Walk test, using TEMS. • Testing the coaxial cable using Site Master. • Installation and commissioning of NSN (FIU19) MW equipments • Installation & commissioning of Powerwave active system (POI, OCM, repeaters). • Installation of Huawei (3900), Ericsson (3206, 2964), and NSN (Ultra Sites/ Flexi) Equipments. • ISP installation between the Remote Unit and the Master Unit • Checking the line of sight in the field and apply it in Path loss program • Aligning the Microwave Antenna as per the transmission design • Attending Site Acceptance Test (SAT)

Education

Education
Sep 2001 - Sep 2008

Bachelor's degree

Albaath University

Electronics & Telecom Engineering 

Sep 1998 - Jun 2001

High School

Al Thagher High School

Skills

Skills

3G

Telecommunications

Microwave

Testing

Integration

Wireless

RF

Internet

Microsoft Office

AutoCAD

RF Engineering

RF troubleshooting

Telecommunications Engineering

Project Management

Technical Leadership

Computer Skills

Communication Skills

Certifications

Certifications
Jul 2010 - Present

Andrew : Mobile In-building active solutions

Andrew, Germany
Jul 2010 - Present

Commscope : optical fiber basics, transmission, and testing

Andrew, Germany
Sep 2008 - Present

Power Wave : Mobile In-building active solutions

Power Wave, Sweden
Aug 2014 - Present

• EADS Claricor system, TETRA.

AIR BUS, Spain