Nitin Tiwari

  • Udaipur RJ
Nitin  Tiwari

Work History

Work History
Jun 2012 - Present

Sr Officer

Coromandel International Ltd
to Till, Pali & Udaipur. Sr Officer Sr. Engineer(Mechanical) in SSP Plant, job Includes Maintenance of SSP & GSSP plant(DEN, MIXER, Roller Mills, Bucket Elevators, Belt Conveyors, Rotary Drums, Blowers Etc) Breakdown analysis, IMS & ISO Documents, Maintaining Site Inventory, Shutdown Planning and Manpower Arrangement, Planning and Preparation for Scheduled Maintenance of Various Equipments.
Mar 2011 - Jun 2012


Hindalco Industries Limited
Since (Birla Copper) Sr.Engineer
Dec 2009 - Mar 2011


Shree Cement Limited

Belt conveyor system, Ball Mill, Horizontal Belt filter(Gaudfrin and Delkor make), slurry handling pumps, acid handling pumps, Gear pumps, Vacuum Pump, Mechanical Seal, Gear Boxes, Agitators, Fan, Bucket elevator, Valves, reactor vessels, storage tanks(, PP/FRP), Couplings, Heat Exchanger(Graphite tube), Condenser, Cooling Tower. Rotary drier, mixers, cyclone separator, maintenance of steam line. Since Shree Cement Ltd. Beawar Engineer Preventive Maintenance(Vibration) Monitoring of Equipments. Equipments Monitoring by NDT techniques(Thickness, Hardness & UT test). Shaft alignment of various Gear boxes & Fans. Planning and Preparation for Scheduled Maintenance of Various Equipments in Cement Plant Industry. Cement Mill Liners changing and convert into double to single chamber. Fly ash Silo internal Air slides modification. Complete training in cement plant in each and every section. Areas of Exposure MAINTENANCE and PROJECT Planning and effecting preventive maintenance schedules of various machineries and instruments to increase machine up time and equipment reliability in SSP Plant. Proactively identifying areas of obstruction/breakdowns and take steps to rectify the equipments through application of trouble shooting tools. Ensuring all the machines are working well by conducting timely checks. Finalising preventive and predictive maintenance schedules to ensure optimum performance Forecasting the spare consumption and arrange the spare on time, to reduce the breakdown time. Foreseeing performance bottlenecks and taking corrective measures to avoid the same. Undertaking activities pertaining to maintenance & backup operations Providing technical support after the installation and commissioning of plant/equipment as well as conducting tests & inspections to ensure operational effectiveness of plant. Managing overall activities pertaining to planning, maintenance, erection and modification of a wide range of machinery, systems and equipments. Take out daily lubrication schedule, daily equipment checking and history book and log book data entry. Maintaining ISO related documents such history card, daily check list, preventive maintenance schedule, weekly report, preventive maintenance, daily engineering log book, failure report and its analysis, indent related activity



B.E. Mechanical

Geetanjali Institute of Technical Studies